
Add to Cart
2. External load
External loads include wind load, snow load, dead load, and live load. Structural engineers calculate the steel structure based on the external load. If the load is large, the amount of steel used in the structure will increase.
3. The span of the steel frame
The larger span of the steel frame, the greater the amount of steel used per steel frame. More than 30 meters is considered a large width. If the steel frame has a large span and no center pillar, the amount of steel used will increase.
4. Structure
For steel structure buildings with cranes or mezzanine floors, to ensure the safe operation of cranes, steel columns will be increased, and columns of an equal cross-section will be adopted, which will increase the amount of steel used in the building.
Main Steel Grade: | Q355 Q345 Q235 Q355B Q345B Q235B |
Beam & Column: | Welded or Hot rolled H-section |
Purlin: | Hot Dipped Galvanized C Z Purlin |
Bolt Accessories: | Foundation bolt & High -Strength Bolts & General Bolt |
Wall & Roof: | EPS /Glass Wool/Rock Wool /PU Sandwich Panel Or Corrugated Steel Sheet |
Door: | Sliding Sandwich Panel Door / Rolling Metal Door |
Window | Aluminum Alloy Window / PVC Window |
Surface | Hot-dip galvanized or painted |
Other | Semi-transparent Skylight belts,Ventilators,Downpipe and Gutter ,Crane 5MT, 10MT, 15MT |
Drawings & Quotation: | 1) Customized design is welcomed. |
iBeehive is a professional manufacturer of steel structures, and bailey bridges with 21 years of experience, finished 3520 projects total of 17600000 sqm. We specialize in providing complete solutions including consulting, design, fabrication, and erection of high-quality pre-engineered steel building and steel structure products.
We have 2 factories with a total area of 150000 m², iBeehive has served the pre-engineered building industry with the highly trained crews, specialized equipment, CWI inspector, and 20 professional design team.
1. Design service:
From structural design to cost-effective
2. Manufacturing:
We have two workshops with a total area of 150,000 square meters and three production lines for the shortest lead time.
For every process of processing and manufacturing, we can provide pictures and videos to let you know your construction process in real-time.
3. Installation Instructions:
We provide one-stop installation guidance, from steel column and purlin installation, welding, to wall panel and roof installation, as well as downpipe and door and window installation.
Instructional materials include pictures, videos, or online call instructions.
4. After-sale service:
We ship with 1-3 buckets of paint. When the steel components are worn out in shipping, you can repair them in time.
We offer the most complete packaging to prevent moisture in transit.
Sheets damaged by force majeure in transit, we can ship new ones for free.
After being put into use, any problem can be solved by contacting us.
Payment Terms
1) Payment: T/T(30% prepaid as deposit, balance 70% before shipment) or L/C at sight
2) Delivery time: 15~40 days, as pre customers' order
3) Shipment Loading: 20"GP, 40"GP, 40"HQ, 40"OT or in bulk
Contact us for more details.